Date: 1999-2003
Extent: 1.52 linear feet (1.2 boxes/3 folders)
Scope and Content: This series contains documents that related to proposed Library renovations. The Cardinal Cushing Library was renovated in the summer of 2006.
Folder List: |
Date: |
Box: |
Folder: |
Cardinal Cushing Library Building Program: A Vision for the Future (1999 November 24) |
1999 November 24 |
6 |
6 |
Oversized
Folder List: |
Date: |
Box: |
Folder: |
Cardinal Cushing Library Existing Building Analysis and Precedents Study (2003 September 26), c. I |
2003 September 26 |
7 |
1 |
Cardinal Cushing Library Existing Building Analysis and Precedents Study (2003 September 26), c. II |
2003 September 26 |
7 |
2 |