Date: 1999-2015
Extent: 7.69 linear feet (7 boxes, 3 sketch renderings and 158 megabytes)
Scope and Content: This series contains the Institutional Master Plans (IMP) (and related material) that were produced for and in conjunction with the College. The IMP is a statement of proposed institutional development that has to be submitted to the Boston Planning and Development Agency (formerly the Boston Redevelopment Authority). An IMP describes an institution’s existing property and future development plans for the duration of the IMP, typically 10 years. Proposed institutional projects must be consistent with an existing IMP. If necessary, IMPs can be amended to add or change descriptions of development plans.
Folder List: |
Date: |
Box: |
Folder: |
Project Impact Report/Environmental Impact Report (Draft |
24 November 1999 |
1 |
N/A |
Project Impact Report/Environmental Impact Report: Technical Appendix (Draft) |
24 November 1999 |
1 |
N/A |
Project Impact Report/Environmental Impact Report: Transportation Appendix (Draft) |
24 November 1999 |
2 |
N/A |
Emmanuel College Master Plan (c. 2000) | c. 2000 | 7 | 1 |
Institutional Master Plan: Project Impact Report/Environmental Impact Report (Final) |
11 May 2000 |
3 |
N/A |
Institutional Master Plan: Project Impact Report/Environmental Impact Report—Technical Appendix (Final) |
11 May 2000 |
4 |
N/A |
Institutional Master Plan: Project Impact Report/Environmental Impact Report—Transportation Appendix (Final) |
11 May 2000 |
5 |
N/A |
Institutional Master Plan: Project Impact Report/Environmental Impact Report—Zoning Appendix (Final) |
11 May 2000 |
5 |
N/A |
The Emerald Necklace Parks Master Plan |
2001 |
6 |
|
Institutional Master Plan: Second Amendment to Institutional Master Plan—Campus Development Plan for Emmanuel College |
June 2002 |
6 |
N/A |
Institutional Master Plan: Second Amendment to Institutional Master Plan—Emmanuel College Acquisition of Libby Building for Dormitory Use | 26 June 2002 | 6 | N/A |
Emmanuel College Institutional Master Plan Amendment | N/A | IMP | |
Emmanuel College Institutional Master Plan | 11 May 2012 | N/A | IMP |
Emmanuel College Institutional Master Plan Amendment | N/A | IMP | |
Second Amendment to the Emmanuel College Institutional Master Plan | 4 November 2015 | 7 | 2 |
Oversized Material
Folder List: |
Date: |
Box: |
Folder: |
Institutional Master Plan: Building Renderings |
c. 2000 |
TBA |
TBA |
Institutional Master Plan: Phasing Plan |
c. 2000 |
TBA |
TBA |